Project Value: 1.2m

Start Date: May 2022

Vartiss is currently working on a tunnel project for a key client in the UK.

The team has fabricated & installed over 4700 brackets to accommodate 1.7km of 200mm & 350mm stainless steel sch-10 welded pipe for the tunnel’s pumped and gravity drainage system.

This will ensure the waste drainage water from the tunnel continues to be successfully pumped away, ensuring the safety of tunnel users.